Q: The RFP mentions a resume form attached to the RFP. Is a special form required?
A: Please submit staff qualifications in the most convenient form. Given the tight timeline for submitting the technical proposals, it is not necessary to use a standard form.
Q: The RFP mentions an Energy Conservation Measure form. Is a special form required?
A: A sample form will be distributed at the pre-proposal meeting on Friday, April 10, 2009. The report format will be refined with the input of the selected Audit Consultants.